J H Rhodes – Relocation to Vernon – 82,000 SF Renovation ($2.1M)
Executive Project Manager:
David Kleps
Project Manager: Lucas Saltsman
Superintendent: Dick Jones



In 2007 we met this specialty manufacturer of polishing pads for the glass and consumer electronics industry. We had originally proposed a new 60,000 sf facility in Clinton, adjacent to their existing plant. The economic collapse of 2008 cancelled that project.

In 2011 the company contacted us about an available vacant building that we happened to have built in 1970. The 82,000 sf vacant former Oneida Container building was in very good condition but would need a major renovation project.

We assembled a design and construction team to facilitate a complete renovation.
The project includes large production rooms and areas with new full height partitions, complete painting of all exposed steel, heavy duty epoxy floor painting, completely new HVAC including several new Roof Top units with plant air conditioning and ventilation, a new 1200 amp electrical service and power to new equipment as well as new Labs and some new Offices.

The project was completed in March of 2013

Additional Images

Click on a thumbnail to view large image.

J H Rhodes - Relocation - Before Picture J H Rhodes - Relocation - Before Picture J H Rhodes - Relocation - Before Picture J H Rhodes - Relocation - Before Picture J H Rhodes - Relocation - Before Picture J H Rhodes - Relocation - Before Picture J H Rhodes - Relocation - Plant floor with Epoxy Floor Paint Finish J H Rhodes - Relocation - Mezzanine Office J H Rhodes - Relocation - Loading Docks J H Rhodes - Relocation - Entrance to Packing J H Rhodes - Relocation - Unfilled Room